Proposed 310 Franklin Ave - All site plan or construction documents, including excavation and grading.

The request was partially successful.

Dear Seaside Heights Borough,

We are requesting the following records for: proposed 310 Franklin Ave - All site plans and construction documents, including Location, extent, amount, and proposed final grades of any filling, grading, or excavation. 310 Franklin ave can not be found in the tax records, but construction has begun so there should be a individual plan for this individual property.

This is a request for public records made under OPRA and the common law right of access. I am not required to fill out an official form. Please acknowledge receipt of this message.

Thank you for your time and immediate attention to this flood concern.

Victoria Coppola, Seaside Heights Borough

1 Attachment

  • Attachment

    PB RESOLUTION 2022 24 LOUISA JOSEPH KOSTIHA 308 FRANKLIN AVE..pdf

    190K View Download

Dear Requestor,

Please see attached from the Planning Board Secretary.

Sincerely,

Victoria Coppola, RMC, CMR
Deputy Borough Clerk
Borough of Seaside Heights
732-212-6806

show quoted sections

Victoria Coppola, Seaside Heights Borough

1 Attachment

  • Attachment

    OPRA 308 Franklin Ave Seaside Heights.docx

    894K View Download

Dear Requestor,

Please see attached grading info.

Sincerely,

Victoria Coppola, RMC, CMR
Deputy Borough Clerk
Borough of Seaside Heights
732-212-6806

show quoted sections

Dear Victoria Coppola,

Thank you for your quick response. We are looking for all open permits on this property. We are most concerned about the excavation and grading for this site. The other 2 newly built properties that were part of this subdivision have added over 6” of soil to these new properties, which has made those property levels higher than they were originally.

We are looking to confirm that the land next to us will match the level of our current property line, avoiding any trespass or nuisance issues, that would be caused by changing the natural course of rainwater drainage.

As per the code book, excavation and grading levels should be submitted with the building plans of all new construction on the barrier island.

We thank you in advance for your attention and care in this matter.

Yours sincerely,

Prairie Rugilo

Victoria Coppola, Seaside Heights Borough

1 Attachment

Dear Requestor,

Please see attached response to your document request from the Construction Dept. Unlisted phone number has been redacted according to N.J.S.A. 47:1A-1.

Sincerely,

Victoria Coppola, RMC, CMR
Deputy Borough Clerk
Borough of Seaside Heights
732-212-6806

show quoted sections