Request for Documents Realted to 2020 Roadwork on 3rd Ave & Waverly

The request was partially successful.

Dear Keyport Borough,

This is a request for public records made under OPRA and the common law right of access. I am not required to fill out an official form. Please acknowledge receipt of this message.
Records requested:

Engineering designs, plans, environmental impact studies, project design plans, surveys, and all documents on record related to the resurfacing/road work that was done on 3rd Avenue in early 2020 (January - April time frame).

Yours faithfully,

Joel Petty
139 3rd St., Unit 4
Keyport, NJ 07735
732-673-8156

Michele Clark, Keyport Borough

Good Afternoon,

I am in receipt of your OPRA request for "engineering designs, plans, environmental impact studies, project design plans, surveys, and all documents on record related to the resurfacing/road work that was done on 3rd Avenue in early 2020 (January - April time frame)."

Your request for these records requires up to an additional seven (7) business days to fulfill because they are being provided to me by the engineer.
Also, your request for "all documents on record" is a broad and/or unclear request. Please identify the specific records requested.

A response will be provided as soon as possible, but not later than October 21, 2021.
Thank you.
Michele

Michele Clark, RMC
Borough Clerk
Borough of Keyport
(732)739-5124

show quoted sections

Dear Michele Clark,

Thank you for looking into my request. By all documents I really just meant if there were any reports on planning or construction that were prepared that I may not have the exact names of. If there are any documents that might be pertinent that I didn't specifically identify, maybe a list could be provided? Otherwise, I think I identified the major docs that would be prepared. I noticed after I submitted this that a similar request had been made previously by someone and in that request you said that some schematics and diagrams may be too large to share electronically. I am available to come in to review those types of documents as well. Thank you.

Yours sincerely,

Joel Petty

Michele Clark, Keyport Borough

3 Attachments

  • Attachment

    19 12 12 Third Street Dead End.pdf

    1.6M View Download

  • Attachment

    19 12 30 Third Street Construction Plans Rev6.pdf

    2.8M View Download

  • Attachment

    20 04 16 Boro Admin Memo East Third St Storm Sewer.pdf

    1015K View Download

Good Evening Joel,

Please see the attached documents provided by the Borough Engineer in response to your OPRA request of October 1, 2021 for " Engineering designs, plans, environmental impact studies, project design plans, surveys, and all documents on record related to the resurfacing/road work that was done on 3rd Avenue in early 2020 (January - April time frame)."

I hope this helps.
Michele

Michele Clark, RMC
Borough Clerk
Borough of Keyport
(732)739-5124