This is an HTML version of an attachment to the Open Public Records Act request 'Correspondence from Twp. Regarding flooding mitigation on Channel Drive'.

Thanks Emil,



I found the original filed map from Shore Acres. It is attached for reference. The map has Channel Drive listed as Lagoon Drive, but it does have a 4-foot wide reserve strip in between the road and the water. I imagine it was either for exactly what you have been using it for, docking, or it was a “Spite-Strip”, which was more common than you would thing in the 1940’s-1960’s. It was a small strip of land to prevent adjacent communities from using one another’s amenities, like roads, clubhouses, etc.



A







Be cautious. Be free. Be well.



Elissa C. Commins PE CFM
Township Engineer & Floodplain Manager
Township of Brick
401 Chambers Bridge Road
Brick, NJ 08723

732.262.1040



From: [email address] <[email address]>
Sent: Thursday, January 18, 2024 5:16 PM
To: Elissa Commins <[email address]>
Cc: lisa moore <[email address]>
Subject: FW: Channel Drive



Hi Elissa,



As discussed, see below for correspondence with Alina. Please be sure to read from the bottom as it states the sewer pipe is ACP.



Let me know what you think about not using helicals once you get the CME plans.



Thank you,







Emil Ranaudo

Engineer Owned + Operated



O: 732.451.4301

M: 732.245.5152

[email address]<mailto:[email address]>

www.TheMandalayGroup.com<http://www.themandalaygroup.com/>







From: Alina Ferreira <[email address]<mailto:[email address]>>
Sent: Thursday, November 9, 2023 8:32 AM
To: [email address]<mailto:[email address]>; [email address]<mailto:[email address]>
Cc: Steve Specht <[email address]<mailto:[email address]>>; Melissa Bumbera <[email address]<mailto:[email address]>>; 'Elissa Commins ([email address]<mailto:[email address]>)' <[email address]<mailto:[email address]>>; 'Russell Harris' <[email address]<mailto:[email address]>>; Steven Price <[email address]<mailto:[email address]>>; Steve Specht <[email address]<mailto:[email address]>>; Melissa Bumbera <[email address]<mailto:[email address]>>
Subject: RE: Channel Drive



Emil – you should test pit to get exact location and depth of water main to make sure it does not interfere with your work.



Thank you,



Alina Ferreira, P.E., P.P., C.M.E.

Project Manager, Engineering Department

Brick Utilities

1551 Highway 88 West

Brick, NJ 08724

P – 732-458-7000; ext. 4289

F – 732-458-8203

[email address]<mailto:[email address]>



From: [email address]<mailto:[email address]> <[email address]<mailto:[email address]>>
Sent: Thursday, November 9, 2023 8:10 AM
To: Alina Ferreira <[email address]<mailto:[email address]>>; [email address]<mailto:[email address]>
Cc: Steve Specht <[email address]<mailto:[email address]>>; Melissa Bumbera <[email address]<mailto:[email address]>>; 'Elissa Commins ([email address]<mailto:[email address]>)' <[email address]<mailto:[email address]>>; 'Russell Harris' <[email address]<mailto:[email address]>>; Steven Price <[email address]<mailto:[email address]>>; Steve Specht <[email address]<mailto:[email address]>>; Melissa Bumbera <[email address]<mailto:[email address]>>
Subject: RE: Channel Drive



Hi Alina,



Sorry for delayed response. Do we still need to do tests given you have records showing it 5.5’ deep? I need to have a meeting with our client for additional costs if so. Additionally, if test pits are still required, are there any specific requirements for the contractor performing the work?



Thank you,







Emil Ranaudo

Engineer Owned + Operated



O: 732.451.4301

M: 732.245.5152

[email address]<mailto:[email address]>

www.TheMandalayGroup.com<http://www.themandalaygroup.com/>







From: Alina Ferreira <[email address]<mailto:[email address]>>
Sent: Thursday, November 2, 2023 2:34 PM
To: [email address]<mailto:[email address]>; [email address]<mailto:[email address]>
Cc: Steve Specht <[email address]<mailto:[email address]>>; Melissa Bumbera <[email address]<mailto:[email address]>>; 'Elissa Commins ([email address]<mailto:[email address]>)' <[email address]<mailto:[email address]>>; 'Russell Harris' <[email address]<mailto:[email address]>>; Steven Price <[email address]<mailto:[email address]>>; Steve Specht <[email address]<mailto:[email address]>>; Melissa Bumbera <[email address]<mailto:[email address]>>
Subject: RE: Channel Drive



Crystal and Emil – we have some records indicating that the main is approximately 5.5 ft deet to the top of main in both locations of replacement bulkhead.



Thank you,



Alina Ferreira, P.E., P.P., C.M.E.

Project Manager, Engineering Department

Brick Utilities

1551 Highway 88 West

Brick, NJ 08724

P – 732-458-7000; ext. 4289

F – 732-458-8203

[email address]<mailto:[email address]>



From: Alina Ferreira
Sent: Wednesday, November 1, 2023 11:46 AM
To: '[email address]' <[email address]<mailto:[email address]>>; [email address]<mailto:[email address]>
Cc: Steve Specht <[email address]<mailto:[email address]>>; Melissa Bumbera <[email address]<mailto:[email address]>>; Elissa Commins ([email address]<mailto:[email address]>) <[email address]<mailto:[email address]>>; Russell Harris <[email address]<mailto:[email address]>>; Steven Price <[email address]<mailto:[email address]>>; Steve Specht <[email address]<mailto:[email address]>>; Melissa Bumbera <[email address]<mailto:[email address]>>
Subject: RE: Channel Drive



Crystal and Emil – as per our meeting today here are some notes:



* The water main on Channel Dr is 6” DIP and appears to come close to bulkhead at certain points; therefore it is requested that Mandalay Group include test pits for location of water main in their work at each change of direction of the water main and where the water main is closest to bulkhead as they see fit. Our inspector shall be present for the test pits, please provide 48 hr advanced notice.
* Care shall be taken when working near the end of the main and near the hydrant. Utilize appropriate construction techniques to ensure that ground remains intact behind the hydrant and behind the end of main at all times.
* During replacement of bulkhead, please have a utility contractor on call in case of emergency. Also, our inspector shall be present during bulkhead replacement project so please provide us 48 hr advanced notice to schedule with our inspector.
* The sewer main is 8” ACP. Please use care around sewer main and ensure that no vibrations/vibratory rollers are used near or on top of the sewer main.



Thank you,



Alina Ferreira, P.E., P.P., C.M.E.

Project Manager, Engineering Department

Brick Utilities

1551 Highway 88 West

Brick, NJ 08724

P – 732-458-7000; ext. 4289

F – 732-458-8203

[email address]<mailto:[email address]>



From: [email address]<mailto:[email address]> <[email address]<mailto:[email address]>>
Sent: Monday, October 23, 2023 12:05 PM
To: Alina Ferreira <[email address]<mailto:[email address]>>; [email address]<mailto:[email address]>
Cc: Steve Specht <[email address]<mailto:[email address]>>; Melissa Bumbera <[email address]<mailto:[email address]>>; Elissa Commins ([email address]<mailto:[email address]>) <[email address]<mailto:[email address]>>
Subject: RE: Channel Drive



Hi Alina,



Please see attached survey , the blue lines is where we will be replacing the bulkhead.



Than you 😊

Crystal Mullen





O: 732.451.4301

M: 732.998.5996





From: Alina Ferreira <[email address]<mailto:[email address]>>
Sent: Friday, October 20, 2023 10:06 AM
To: [email address]<mailto:[email address]>
Cc: [email address]<mailto:[email address]>; Steve Specht <[email address]<mailto:[email address]>>; Melissa Bumbera <[email address]<mailto:[email address]>>; Elissa Commins ([email address]<mailto:[email address]>) <[email address]<mailto:[email address]>>
Subject: Channel Drive



Emil – here is the utility map for Channel Drive. We have 6” DIP water main and ACP sewer main on this road. Please provide a map of which parts of bulkhead you are replacing and approximate locations of helical anchors.



Thank you,



Alina Ferreira, P.E., P.P., C.M.E.

Project Manager, Engineering Department

Brick Utilities

1551 Highway 88 West

Brick, NJ 08724

P – 732-458-7000; ext. 4289

F – 732-458-8203

[email address]<mailto:[email address]>



CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.