Good Morning,
There are no records responsive, this completes your OPRA request.
Best,
Lauren M. Dotoli
Assistant to the
Municipal...
Hi,
In response to your OPRA request, Construction Department information is attached.
They note the following:
SDL does not have the OPEN ONLY optio...
Please see attached…OPRA information
Therese P. Wollman, CMR
Administrator’s Assistant/Vital Statistics
[1]www.rumsonnj.gov
Twitter: [2]@Rumso...
Attached please find the information as requested in the OPRA Request
dated December 19, 2020
Therese P. Wollman, CMR
Administrator’s Assistant...
Hello
Items:
1. NONE
2. NONE
3. NONE
4. NONE
5. & 6. ATTACHED
7. NONE
8. ATTACHED
If you require additional information please do not hesitate to co...
Hi,
In response to your OPRA Request below:
Engineering does not have any information for the property.
Two Zoning Permits attached.
Construction re...
Hi,
In response to your OPRA Request below:
Attached is Construction detail and a survey document.
Code enforcement does not have any open or closed...
Hi,
In response to your OPRA request below:
Construction documentation is attached.
No Zoning, Code or Engineering information was found.
Thank yo...
Hi,
In response to your OPRA Request below:
Our Construction Department has provided the attached.
Thank you.
Heather Frketich
Assistant To The
M...
Hi,
In response to your OPRA Request below:
Zoning and Construction detail are attached..
Thank you.
Heather Frketich
Assistant To The
Municipa...
Hi,
In response to your OPRA Request below:
Zoning permits (4 attachments)
Construction permits (1 attachment)
Engineering records (3 attachments)
T...
See attached and below:
Thomas S. Rogers, RMC
Administrator/Municipal Clerk
[1]www.rumsonnj.gov
Twitter: [2]@Rumson_Borough
Tel: 732-842-3300...
Hello
In response to your OPRA inquiry for the above captioned location, please find the attached Construction response.
In addition,
Code Enforcem...
Hi,
In response to your OPRA Request below:
The Construction Department response is attached.
Thank you.
Heather Frketich
Assistant To The
Munic...
Hello,
Please see attached documents recoded for your OPRA request.
This completes your request.
Regards,
Eric Paone-Hurd
Borough of Rumso...
Hi,
In response to your OPRA request regarding 43 Park Ave, Construction Permits are attached.
In addition, there are no records from Code Enforcemen...
Dear Mr. Glatfelter,
In response to your records request, please find attached to this email a PDF copy of the League's 2021 Municipal Directory.
Wit...
G.R.,
In response to your records request, please find attached to this email a PDF copy of the League's 2021 Municipal Directory.
With this response...
Good afternoon,
Your OPRA Request has been forwarded to me for reply.
See attached documents.
Helen L. Graves, CMFO, CTC, QPA
Borough of Rumson
80...
Hi,
In response to your OPRA Request below:
1)
Attached is Zoning information ....... Old surveys for Lots 17, 18 and 19, a 2007 Site Plan for Lot 1...
Be more specific as to the types of open permits you are looking for
Therese P. Wollman, CMR
Human Resources Manager
Registrar of Vital Statistics
w...
Response attached.
Thomas S. Rogers, RMC
Administrator/Municipal Clerk
www.rumsonnj.gov
Twitter: @Rumson_Borough
Tel: 732-842-3300
BOROUGH OF RUMSO...
Good Afternoon,
Attached please find the response to your OPRA received today. This will
complete this request.
Thank you and have a good...
Hi,
In response to your OPRA Request below:
Construction Department response is attached.
Thank you.
Heather Frketich
Assistant To The
Municipal...
Hello,
Please be advised there is no indication within this email of the specific OPRA information requested in regard to 165 Bingham Ave, Block 125,...