Complaints against PSE&G regarding gas service
Dear New Jersey Board of Public Utilities,
This is a request for public records made under OPRA and the common law right of access. I am not required to fill out an official form. Please acknowledge receipt of this message.
Records requested:
Statistics of Complaints against PSE&G regarding gas service summarized by year, month & category from 2012 - present.
Yours faithfully,
Marc Cooperman
Good morning,
Attached is a copy of the document that you requested. This matter is now
considered closed.
Service Complaints – Gas
2012
2013
[1]APPLIANCE REPAIR 35 FURNACE REPAIR 14 GAS LEAK 6 GAS LINE RELOCATION 4
GAS MAIN INSPECTION 1 NO HEAT 7 NO SHOW 3 UNCOMPLETED WORK 13 Total: 83
2014
[2]APPLIANCE REPAIR 41 FURNACE REPAIR 6 GAS LEAK 26 GAS LINE RELOCATION 6
GAS MAIN INSPECTION 3 GAS ODOR PRESENT 4 LOW GAS PRESSURE 4 NO HEAT 23 NO
SHOW 8 TURN ON SERVICE 20 UNCOMPLETED WORK 17 Total: 158
2015
[3]1 APPLIANCE REPAIR 30 FURNACE REPAIR 8 GAS LEAK 19 GAS LINE RELOCATION
1 GAS MAIN INSPECTION 4 GAS ODOR PRESENT 7 LOW GAS PRESSURE 4 NO HEAT 16
NO SHOW 2 TURN ON SERVICE 24 UNCOMPLETED WORK 21 Total: 137
2016
[4]1 APPLIANCE REPAIR 7 FURNACE REPAIR 4 GAS LEAK 5
[5]GAS LINE RELOCATION 4 GAS ODOR PRESENT 3 LOW GAS PRESSURE 2 NO HEAT 21
NO SHOW 5 TURN ON SERVICE 12 UNCOMPLETED WORK 12 Total: 76
2017
[6]APPLIANCE REPAIR 4 FURNACE REPAIR 3 GAS LEAK 12 GAS LINE RELOCATION 9
[7]GAS MAIN INSPECTION 3 GAS ODOR PRESENT 6 LOW GAS PRESSURE 2 NO HEAT 18
NO SHOW 1 TURN ON SERVICE 23 UNCOMPLETED WORK 33 Total: 114
2018
[8]APPLIANCE REPAIR 2 FURNACE REPAIR 5 GAS LEAK 14 GAS LINE RELOCATION 9
GAS MAIN INSPECTION 1 GAS ODOR PRESENT 7
[9]LOW GAS PRESSURE 3 NO HEAT 23 NO SHOW 3 TURN ON SERVICE 27 UNCOMPLETED
WORK 32 Total: 126
2019
[10]APPLIANCE REPAIR 9 COMPANY EQUIPMENT 3 FURNACE REPAIR 2
[11]GAS LEAK 6 GAS LINE RELOCATION 8 GAS ODOR PRESENT 3 LOW GAS PRESSURE 3
NO HEAT 13 NO SHOW 3 TURN ON SERVICE 12 UNCOMPLETED WORK 17 Total: 79
2020
[12]APPLIANCE REPAIR 26 COMPANY EQUIPMENT 5 FURNACE REPAIR 2 GAS LEAK 7
GAS LINE RELOCATION 4
[13]GAS MAIN INSPECTION 1 GAS ODOR PRESENT 3 LOW GAS PRESSURE 2 NO HEAT 16
NO SHOW 3 TURN ON SERVICE 11 UNCOMPLETED WORK 13 Total: 93
2021 – As of July 31
[14]1 APPLIANCE REPAIR 6 COMPANY EQUIPMENT 3 FURNACE REPAIR 1 GAS LEAK 2
GAS LINE RELOCATION 4 GAS MAIN INSPECTION 1 GAS ODOR PRESENT 3 LOW GAS
PRESSURE 1 NO HEAT 3 NO SHOW 1 TURN ON SERVICE 3 UNCOMPLETED WORK 8 Total:
37
Peter Hilerio, Esq.
Office of the Secretary
New Jersey Board of Public Utilities
44 South Clinton Ave.
Trenton, NJ 08625
Office: (609) 292-4136
[15][email address]
[16]www.nj.gov/bpu
[17]NJBPU 120
Connect with us on social:
[18]cid:image006.png@01D567F7.89FE8700
[19]cid:image007.png@01D567F7.89FE8700 [20]cid:image008.png@01D567F7.89FE8700 [21]cid:image009.png@01D567F7.89FE8700 [22]cid:image010.png@01D567F7.89FE8700
References
Visible links
15. mailto:[email address]
16. http://www.nj.gov/bpu
17. https://www.nj.gov/bpu
18. https://www.facebook.com/njbpu/
19. https://twitter.com/njbpu
20. https://www.instagram.com/njboardofpubli...
21. https://www.linkedin.com/company/new-jer...
22. https://www.youtube.com/channel/UCX8pm95...