We don't know whether the most recent response to this request contains information or not – if you are Maddie Baisley please sign in and let everyone know.

Bid Tabulation Results for 2023-2024 Milling & Road Surface Preparation for DPW Resurfacing of Various Streets

We're waiting for Maddie Baisley to read a recent response and update the status.

Dear Piscataway Township

This is a request for public records made under OPRA and the common law right of access. Please acknowledge receipt of this message.

Records requested:
Please send the final and compiled bid tabulation (Bid Tally), including all quantities and unit pricing for each bidder, for 2023-2024 Milling & Road Surface Preparation for DPW Resurfacing of Various Streets that was submitted on 6/29/2023 12:00 PM.

Below is an example of the format we are looking for that the engineer usually creates at the completion of the bid:

| | BIDDER 1 | BIDDER 2 |
|-------------------------------------------------------------------------------|
| Item | Description | QNT | UNIT | AMOUNT | UNIT | AMOUNT |
| | | | | |
| | | | | |
| | | | | |

Please send all documents electronically.

Thanks,
PPA

Kelly Mitch, Piscataway Township

1 Attachment

  • Attachment

    Contractors list 2023 2024 MILLING ROAD SURFACE PREPARATION FOR DPW RESUFACING OF VARIOUS STREETS.pdf

    30K View Download

Good Afternoon,

Attached are the documents responsive to your OPRA. The Purchasing Department advises that attached is the preliminary bid results and that this bid is under review.

Your request is now closed.

Thank you,

Kelly Mitch
Deputy Township Clerk
Clerks Dept

[email address]

Dear Kelly Mitch,

We are looking for a document for this project with unit prices per item from each bidder. Do you have this?

Yours sincerely,

PPA

Piscataway Township

2 Attachments

  • Attachment

    attachment.delivery status

    0K Download DSN: 4.4.7 Delivery time expired

  • Attachment

    attachment.bin

    2K Download

Delivery is delayed to these recipients or distribution lists:

[1]Kelly Mitch

Subject: Re: OPRA Response - M. Baislesy - 2023-2024 Milling & Road
Surface Preparation for DPW Resurfacing of Various Streets

This message has not yet been delivered. Microsoft Exchange will continue
to try delivering the message on your behalf.

Delivery of this message will be attempted until 7/16/2023 8:39:55 AM
(GMT-05:00) Eastern Time (US & Canada). Microsoft Exchange will notify you
if the message can't be delivered by that time.

══════════════════════════════════════════════════════════════════════════

Sent by Microsoft Exchange Server 2007

References

Visible links
1. mailto:[email address]

We don't know whether the most recent response to this request contains information or not – if you are Maddie Baisley please sign in and let everyone know.